Nine more meters per day
As an example, he cites the rig’s auto-drilling function which enables it to drill autonomously during shift changes and other breaks. In this way, he estimates that nine more meters can be drilled each day.
Furthermore, the rig is able to continuously monitor the drilling performance and display the data on a touchscreen mounted on the control panel. This makes it easy for the drilling foreman to make instant decisions during drilling and yet allows all drilling parameters to be analyzed in more depth afterwards via the Exploration Manager tool.
All drilling and operational data is recorded by the rig control system and can be exported to Exploration Manager using a USB flash drive, for review on a computer. This grade control analysis enables Özkayhan’s team to identify further areas where performance can be improved.
In addition, as all of the drilling parameters can be programed, the operator can stay away from the immediate drilling area and supervise the operation from a safe distance. But smart mining was not the only reason for purchasing the new Diamec Smart 6. The close cooperation offered by Epiroc in terms of service and maintenance and operator training were all contributing factors.
Continues Özkayhan: “We place a lot of importance on service in order to get the optimal performance from the rig. Epiroc did a good job providing training for the operators during the start-up phase as well training for maintenance personnel,” adding that the operators’ previous experience of using Diamec equipment proved to be an important advantage.
He concludes: “The Diamec Smart 6 is enabling us to achieve a safer, more efficient and low-cost production.”