Problem solvers at the Doha Metro
June 14, 2016
A surface drilling solution to an underground dilemma.
June 14, 2016
A surface drilling solution to an underground dilemma.
July 21, 2015
Calculating how much rock needs excavating in preparation for a construction project is usually a fairly accurate process. But in Vega, while this process was under way, it was decided that one of the buildings would be relocated several meters from the original site, resulting in more rock than originally planned.
January 6, 2016
Three new editions of the FlexiROC range of surface drill rigs have been introduced, each adapted for a wide range of applications in construction and quarrying.